Back to the complete issue
Monday, 14 December 2020

El Nasr to sign final contracts for EV production with Dongfeng this month

El Nasr Automotive will sign the final contracts this month for its partnership with China’s Dongfeng to assemble electric vehicles locally, El Nasr CEO Hany El Kholy tells the local press. The partnership will eventually see the assembly of 25k electric vehicles per year, and is expected to cost some EGP 2.5 bn. State coffers will cover half of the cost, El Kholy said. El Nasr Automotive was reportedly in negotiations with a syndicate of local banks for a EGP 2 bn loan to establish the EV facility following the signing of an MoU with Dongfeng last June.

Is there an opening for private sector players to get in on the facility? El Kholy suggested that “the door is open” for private participation in the project, although it is unclear in what capacity.

The electric vehicle assembly line will be installed in 2Q2021, said El Kholy, with production of the vehicles expected to begin in 4Q2021. El Nasr is currently in talks with local suppliers to meet a local component quota of at least 50%, El Kholy said.

The government has proposed a number of incentives to promote the conversion to electric vehicles, including set charging prices and subsidies of up to 50k per vehicle. Public entities will also be required to replace 5% of their fleet every year with electric cars. Read more on the El Sisi administration’s push for EVs and the logistical hurdles, including the establishment of costly infrastructure such as charging stations networks, which we talk about in our weekly Hardhat vertical.

Enterprise is a daily publication of Enterprise Ventures LLC, an Egyptian limited liability company (commercial register 83594), and a subsidiary of Inktank Communications. Summaries are intended for guidance only and are provided on an as-is basis; kindly refer to the source article in its original language prior to undertaking any action. Neither Enterprise Ventures nor its staff assume any responsibility or liability for the accuracy of the information contained in this publication, whether in the form of summaries or analysis. © 2022 Enterprise Ventures LLC.

Enterprise is available without charge thanks to the generous support of HSBC Egypt (tax ID: 204-901-715), the leading corporate and retail lender in Egypt; EFG Hermes (tax ID: 200-178-385), the leading financial services corporation in frontier emerging markets; SODIC (tax ID: 212-168-002), a leading Egyptian real estate developer; SomaBay (tax ID: 204-903-300), our Red Sea holiday partner; Infinity (tax ID: 474-939-359), the ultimate way to power cities, industries, and homes directly from nature right here in Egypt; CIRA (tax ID: 200-069-608), the leading providers of K-12 and higher level education in Egypt; Orascom Construction (tax ID: 229-988-806), the leading construction and engineering company building infrastructure in Egypt and abroad; Moharram & Partners (tax ID: 616-112-459), the leading public policy and government affairs partner; Palm Hills Developments (tax ID: 432-737-014), a leading developer of commercial and residential properties; Mashreq (tax ID: 204-898-862), the MENA region’s leading homegrown personal and digital bank; Industrial Development Group (IDG) (tax ID:266-965-253), the leading builder of industrial parks in Egypt; Hassan Allam Properties (tax ID:  553-096-567), one of Egypt’s most prominent and leading builders; and Saleh, Barsoum & Abdel Aziz (tax ID: 220-002-827), the leading audit, tax and accounting firm in Egypt.