Back to the complete issue
Thursday, 27 December 2018

Egypt to complete 95% of fiber optic cable network by 2020

Telecom Egypt will have replaced 95% of internet copper cables with fiber optic cables by 2020 for faster internet connection, House ICT Committee head Ahmed Zidane, tells Youm7. So far the state-owned company has replaced 60% of the cable network, he said. Egypt had expected to be done with 70% of the network by the end of 2018.

Enterprise is a daily publication of Enterprise Ventures LLC, an Egyptian limited liability company (commercial register 83594), and a subsidiary of Inktank Communications. Summaries are intended for guidance only and are provided on an as-is basis; kindly refer to the source article in its original language prior to undertaking any action. Neither Enterprise Ventures nor its staff assume any responsibility or liability for the accuracy of the information contained in this publication, whether in the form of summaries or analysis. © 2021 Enterprise Ventures LLC.

Enterprise is available without charge thanks to the generous support of Commercial International Bank (tax ID: 204-891-949), the largest private-sector bank in Egypt; EFG Hermes (tax ID: 200-178-385), the leading financial services corporation in frontier emerging markets; SODIC (tax ID: 212-168-002), a leading Egyptian real estate developer; SomaBay (tax ID: 204-903-300), our Red Sea holiday partner; Infinity (tax ID: 474-939-359), the ultimate way to power cities, industries, and homes directly from nature right here in Egypt; CIRA (tax ID: 200-069-608), the leading providers of K-12 and higher level education in Egypt; Orascom Construction (tax ID: 229-988-806), the leading construction and engineering company building infrastructure in Egypt and abroad; and Act Financial (tax ID: 493-924-612), the leading activist investor in Egypt; and Abu Auf (tax ID: 584-628-846), the leading health foodmaker in Egypt and the region.